Completed work

Step 2: Pumping out

Making a hole in the water

1 September 08.00
1 September 08.00
1 September 10.00
1 September 10.00
1 September 11.00
1 September 11.00
1 September 12.00
1 September 12.00
1 September 13.00
1 September 13.00

Once you have your site set up, you need to empty the water out of the lock so you can see what needs attention. Locks are very seldom ‘dewatered’ so you don’t know what you are going to find – water can do a lot of damage to concrete over the years if it gets into cracks and rusts the reinforcing metal bars inside.

All locks have grooves running down the walls outside the lock gates. To drain the lock, you drop metal or wooden panels into the grooves at each end to create a watertight barrier. You then pump out the water out and climb down to take a look. 

The picture slider shows you the moment that the lock floor came into site on the morning of 1 September.

In case you are wondering, we didn’t find anything very unusual at the bottom of the lock! There was a lot of silt, a certain amount of rubbish, and a bad smell.